Red Bull Charge: Power Up, Conquer the Park

Published July 12, 2025
Reading time: 5 min
As the design lead on this project, my main goal was to drive strategic thinking, align brand purpose with user experience and business viability, and transform a creative concept into an actionable, measurable initiative.

Categories

Leadership
Strategy
Product Process


Context

This project simulates a real-world design leadership challenge for a brand activation, developed during the UX Design Leadership course at The Starter.

The challenge was to select a brand and a park to create an initiative connecting digital and physical experiences. The solution needed to include:

  • A digital feature or product
  • A concept container within the park
  • An implementation plan aligned with business objectives and audience expectations

For this project, I chose Red Bull as the brand and Ibirapuera Park in São Paulo as the location.

I. Diagnosis & Insights

To build a solid foundation, I started with a contextual and behavioral analysis:

  • Ibirapuera Park audience: diverse, highly oriented toward wellness, outdoor activities, and cultural experiences
  • Brand context: Red Bull was launching its new Winter Edition flavor, centering communications on energy and cold-resilience
  • Seasonal factor: São Paulo winter with unusually low temperatures, influencing habits and motivation
  • User behavior: significant increase in physical activities like running and walking

Based on these insights, I created a Business Model Canvas to structure the business proposal, followed by a Value Proposition Canvas to clearly identify user pains, gains, and opportunities to connect the brand with its audience.

I also developed an “Is / Isn’t – Does / Doesn’t” matrix to align expectations, define project boundaries, and focus on the most impactful deliverables.

Key insight: the audience seeks energy and purpose in outdoor experiences—a direct match with Red Bull’s value proposition.

II. The Solution – Red Bull Charge

Power Up, Conquer the Park

The solution integrates culture, technology, and performance, linking the physical and digital journeys across two complementary fronts:

Digital Feature: Gamifying the Experience

  • Embedded in the Red Bull app, this feature connects with wearables (Strava, Apple Watch, etc.) and unlocks geolocated challenges throughout the park.
  • Users earn energy points by visiting cultural spots, engaging in sports, or completing missions, competing on a local leaderboard.
  • Rewards include products, tickets, and exclusive brand experiences—reinforcing Red Bull’s energy and daily relevance.

Concept Container: Winter Edition

An immersive, multifunctional park space combining interaction, rest, and performance:

  • Interactive screen with real-time leaderboard and check-ins
  • Winter Edition energy drink distribution
  • Winter sports simulation booth
  • Retractable stage for talks, DJs, and cultural activations
  • Solar-powered recharge station and social lounge
  • Direct integration with the app for redeeming rewards


III. Strategy

I guided the project using OKRs to ensure clarity, focus, and strategic alignment. This framework informed design decisions, prioritized efforts, and kept digital, physical, and operational elements aligned with a shared purpose.

These OKRs were tied directly to Red Bull’s corporate objectives:

These indicators helped translate the creative vision into measurable results, directly connecting to the brand’s global goals and reinforcing design’s role as a strategic catalyst for the business.

IV. Implementation Plan

I applied a RACI Matrix (Responsible, Accountable, Consulted, Informed) to define clear roles across all teams, ensuring efficient communication and avoiding task overlap.

The implementation plan outlines the full project flow, from initial request to post-launch, covering discovery, ideation, prototyping, testing, QA, and monitoring. This structure helped align multidisciplinary teams (product, design, tech, marketing) and ensured consistency between physical and digital experiences.


V. Conclusion

Red Bull Charge was designed as a brand asset, not an operational cost. The project demonstrates the ability to translate business objectives into user experience requirements, guiding a phygital solution from concept to implementation while maintaining sustainable business metrics.

Although developed in an educational context, Red Bull Charge simulates a real-world design leadership challenge, spanning strategic reasoning to execution. Beyond a creative proposal, the project exemplifies practical UX Leadership skills, including:

  • Systemic and strategic vision connecting design, business, and brand
  • Data-driven, context-aware decision-making
  • Goal management and alignment across teams and stakeholders
  • Creating experiences with purpose and cultural impact